Sunday, October 25, 2009

Weekend Update - Part 1

Whew! So much has been accomplished in the last week! We have two projects to finish and then it's move-in time. I sent November's rent check in today along with a notice that we would be out by the end of November. Pretty exciting!

Our countertops and almost all of our plumbing fixtures were installed last week.

We chose quartz countertop for the master bath and rectangle shaped sinks.

Toilets were also installed. This is a really big deal as we have been driving to the gas station in Bennet to use the restroom. Even though we don't have a door (we have a lovely tarp hanging in the doorway), having a working toilet sure beats driving to the stinky gas station.



Our foyer bath contains a granite top and a vessel sink which I'm not 100% sure about yet. It's growing on me, but it's an incredibly slow growth. I do love the faucet!

Our kitchen will have two faucets (one for filtered water) but we ran into a small snag with the installation of the second faucet. Nothing that can't be fixed though.

The countertops in the kitchen are Corian. They are whiter than what I had anticipated, but I think they look great with the dark wood.

Finally, we installed a pedestal sink in the bathroom by the garage.


More to come in part 2...