Another weekend of hard work done. We're getting closer but it still seems like move-in will never happen. At this point, we think we only have 4 things left before we can get our occupancy permit. The railing for the stairs and catwalk have to be done which of course means the floors have to be done. We also have to build a proper set of stairs in the garage and Dave has to finish the tile floors.
Of course, these are only what we have to get done. The countertops need to be installed. Did I mention this is happening on Wednesday!? After that the electrician can finish. Once Dave has the tile floors done, the plumber can install the faucets and toilets. Lots left, but the end is in sight.
So, this past weekend, Dave finished the tile in the entryway/bathroom/laundry room. We are 3 tiles short so grout has to wait.

(Ignore the light - I should have moved it before taking a picture but I was apparently too tired to do so.)
My dad put flooring on the back of the bar. We decided this would wear much better than painted drywall. I'm not interested in cleaning footprints and scuff marks off of paint.

My dad also continued to install the flooring. He's working on the stairs. It's quite the time consuming project and Dave and I are so thankful that he can do it!
(Dave's been wanting to dangle his feet from above for a while now. I told him he had better get up there because the railing is going up soon and then he wouldn't be able to.)

Dave also started tiling our bathroom floor.


And we even took time to enjoy the beautiful scenery. The leaves are starting to turn and everything looks awesome outside.
So, what did your mom do all weekend when the rest of you were hard at work?
ReplyDelete